This is one of the project during month of March 2007. This is bad landslip and the contractor need the cross-section plan before start re-build the erosion part.
The interval requested is every 1m.
The survey is carried out as normal prosidure.
First - datum for the work
Second - details survey for the part where eroded.
Third-use exisitng channel as station for control